TEC-FORTechnology for manufacturing
DWG TF-001 / Manufacturing technology consulting

I help manufacturers get more from the plants they already have.

I'm Trevor Brander, a Certified Engineering Technologist with over 25 years in industrial manufacturing. I have programmed the PLCs, led process control across a company and run plants as general manager. Tec-For is my consulting practice.

25+ YR EXPERIENCE 123
Experience25+ years
DesignationC.E.T.
LeanGreen Belt
IndustriesAll manufacturing
Worked inNorth America, Europe, Japan, Oceania
BasedEdmonton, Alberta
What I believe

Most plants do not need more technology. They need the right technology, applied to the right constraint, and people who trust it.

Section 01

Where I can help

3 disciplines / 9 services
1.0

Operational efficiency

Finding where time, material and effort are being lost, and fixing it with the people who run the process.

  • 1.1Process optimization
  • 1.2Lean manufacturing
  • 1.3Workforce training and development
2.0

Industrial automation

Controls that operators understand and maintenance can support, designed around how the line really runs.

  • 2.1Control systems
  • 2.2Industrial networks
  • 2.3Machine vision and robotics
3.0

Safety and reliability

Technology that protects people and keeps equipment running between planned shutdowns.

  • 3.1Functional safety systems
  • 3.2Predictive maintenance systems
  • 3.3Automatic lubrication systems
Service details→
Section 02

How an engagement goes

Every engagement, in order

The technology is the easy part. The work is understanding the process and bringing the people along.

Step 01

Walk the floor

I start in the plant, watching the process and listening to the people who run it.

Step 02

Find the constraint

Data and observation pin down what is limiting throughput, quality, safety or uptime.

Step 03

Fix it together

We design the change with operators, maintenance and management, so it belongs to the plant.

Step 04

Leave it running

I train the team, document the work and confirm the result holds before stepping away.

Section 03

Recent work

Two field reports
Sawmill, Western Australia

Two weeks on site. Twenty-three control changes, each one logged.

In October 2026 I spent two weeks on site at a sawmill in Western Australia. The brief was to use automation to increase production. Working with the site's own team, I went through the green mill, log yard and dry mill: how logs are fed and gapped at primary breakdown, how the edger infeed decks fill, how the trimmer handles its backlog, and how the stackers and lug loader are fed.

Every change was logged with its program, routine and rung, so the site team can find it, tune it or take it back out. In the second week the site reported the primary breakdown holding full speed for most of a night shift.

“The mill is flying and the crews have provided very positive feedback.”

Optimisation superintendent, by email after the visit
Site
Sawmill, Western Australia
On site
Two weeks, October 2026
Areas
Green mill, log yard, dry mill
Changes
23 control changes, each logged to the rung
Next
Invited back for a second visit
Boucher Bros. Lumber, Nampa, Alberta

A line run entirely by hand, now running in auto.

At Boucher Bros. Lumber I automated the tree-length infeed to the debarker. It had always been under fully manual control, with operators running the line by hand.

Today cameras watch the logs from the feeder through to the debarker exit, the mill's PLC controls the flow, and the operators supervise. The mill's own people run it and tune it.

Site
Boucher Bros. Lumber, Nampa, Alberta
Line
Tree-length infeed to the debarker
Before
Fully manual control
Now
Runs in auto, operators supervise
Section 04

From the control cabinet to the front office

About Trevor

That mix is uncommon. I can write the logic, and I have also carried responsibility for the safety, people and results of a whole site.

Stage 01

Controls

Started as a PLC programmer, writing and commissioning the logic that runs the line.

Stage 02

Process control and optimization

Led process control and optimization company-wide at Tolko Industries.

Stage 03

Operations

Ran plants as a plant manager and then general manager.

Stage 04

Tec-For

Now consulting independently, a Lean Green Belt who is still hands-on with the technology.

More about Trevor→
Section 05

Tell me about your plant

Replies come from me directly

Describe what the line is doing and what you want it to do. You will hear back from me directly.

Phone778-212-0720 Emailinfo@tec-for.com
BasedEdmonton, Alberta
On siteWorldwide