I help manufacturers get more from the plants they already have.
I'm Trevor Brander, a Certified Engineering Technologist with over 25 years in industrial manufacturing. I have programmed the PLCs, led process control across a company and run plants as general manager. Tec-For is my consulting practice.
Most plants do not need more technology. They need the right technology, applied to the right constraint, and people who trust it.
Where I can help
3 disciplines / 9 servicesOperational efficiency
Finding where time, material and effort are being lost, and fixing it with the people who run the process.
- 1.1Process optimization
- 1.2Lean manufacturing
- 1.3Workforce training and development
Industrial automation
Controls that operators understand and maintenance can support, designed around how the line really runs.
- 2.1Control systems
- 2.2Industrial networks
- 2.3Machine vision and robotics
Safety and reliability
Technology that protects people and keeps equipment running between planned shutdowns.
- 3.1Functional safety systems
- 3.2Predictive maintenance systems
- 3.3Automatic lubrication systems
How an engagement goes
Every engagement, in orderThe technology is the easy part. The work is understanding the process and bringing the people along.
Walk the floor
I start in the plant, watching the process and listening to the people who run it.
Find the constraint
Data and observation pin down what is limiting throughput, quality, safety or uptime.
Fix it together
We design the change with operators, maintenance and management, so it belongs to the plant.
Leave it running
I train the team, document the work and confirm the result holds before stepping away.
Recent work
Two field reportsTwo weeks on site. Twenty-three control changes, each one logged.
In October 2026 I spent two weeks on site at a sawmill in Western Australia. The brief was to use automation to increase production. Working with the site's own team, I went through the green mill, log yard and dry mill: how logs are fed and gapped at primary breakdown, how the edger infeed decks fill, how the trimmer handles its backlog, and how the stackers and lug loader are fed.
Every change was logged with its program, routine and rung, so the site team can find it, tune it or take it back out. In the second week the site reported the primary breakdown holding full speed for most of a night shift.
“The mill is flying and the crews have provided very positive feedback.”
Optimisation superintendent, by email after the visit
- Site
- Sawmill, Western Australia
- On site
- Two weeks, October 2026
- Areas
- Green mill, log yard, dry mill
- Changes
- 23 control changes, each logged to the rung
- Next
- Invited back for a second visit
A line run entirely by hand, now running in auto.
At Boucher Bros. Lumber I automated the tree-length infeed to the debarker. It had always been under fully manual control, with operators running the line by hand.
Today cameras watch the logs from the feeder through to the debarker exit, the mill's PLC controls the flow, and the operators supervise. The mill's own people run it and tune it.
- Site
- Boucher Bros. Lumber, Nampa, Alberta
- Line
- Tree-length infeed to the debarker
- Before
- Fully manual control
- Now
- Runs in auto, operators supervise
From the control cabinet to the front office
About TrevorThat mix is uncommon. I can write the logic, and I have also carried responsibility for the safety, people and results of a whole site.
Controls
Started as a PLC programmer, writing and commissioning the logic that runs the line.
Process control and optimization
Led process control and optimization company-wide at Tolko Industries.
Operations
Ran plants as a plant manager and then general manager.
Tec-For
Now consulting independently, a Lean Green Belt who is still hands-on with the technology.
Tell me about your plant
Replies come from me directlyDescribe what the line is doing and what you want it to do. You will hear back from me directly.