TEC-FORTechnology for manufacturing
DWG TF-002 / Services

Where I can help.

Engagements range from a one-day assessment to leading a project through commissioning. Each one is scoped to the problem, not to a package, for manufacturers in any industry.

Section 01

Operational efficiency

Items 1.1 to 1.3

Getting more good product out of the plant you already have.

1.1

Process optimization

I study the process end to end, measure where throughput, recovery and uptime are being lost, and prioritize the fixes that pay back fastest.

1.2

Lean manufacturing

Lean tools applied where they fit: value stream mapping, standard work, visual management and structured problem solving. I am a Lean Sensei International certified Green Belt.

1.3

Workforce training and development

Building the skills of operators, trades and supervisors, so the improvements last after I leave.

Section 02

Industrial automation

Items 2.1 to 2.3

Controls designed by someone who has also been accountable for the production numbers.

2.1

Control systems

PLC and HMI design, programming, troubleshooting and upgrades, including migration planning for ageing controllers.

2.2

Industrial networks

Plant-floor network design and clean-up, so controllers, drives, cameras and business systems communicate reliably.

2.3

Machine vision and robotics

Assessing where vision and robotics make sense, specifying the system and integrating it with the existing controls.

Section 03

Safety and reliability

Items 3.1 to 3.3

Protecting people and keeping equipment available.

3.1

Functional safety systems

Safety controllers, guarding interlocks and safe-access systems that protect people without tempting them to bypass.

3.2

Predictive maintenance systems

Using the data already in the control system, plus targeted sensors, to see failures coming and plan the repair.

3.3

Automatic lubrication systems

Specifying and commissioning automatic lubrication, so bearings and chains get the right amount at the right time.

Section 04

How an engagement goes

Every engagement, in order

The technology is the easy part. The work is understanding the process and bringing the people along.

Step 01

Walk the floor

I start in the plant, watching the process and listening to the people who run it.

Step 02

Find the constraint

Data and observation pin down what is limiting throughput, quality, safety or uptime.

Step 03

Fix it together

We design the change with operators, maintenance and management, so it belongs to the plant.

Step 04

Leave it running

I train the team, document the work and confirm the result holds before stepping away.

Section 05

Tell me about your plant

Replies come from me directly

Describe what the line is doing and what you want it to do. You will hear back from me directly.

Phone778-212-0720 Emailinfo@tec-for.com
BasedEdmonton, Alberta
On siteWorldwide